Tonkolili District · Sierra Leone

Responsible gold mining, built on partnership with African communities.

AK Minerals operates a mechanised gold mining project in the Kafe Chiefdom of Sierra Leone, combining disciplined operations with genuine community partnership and environmental stewardship.

Concession Area
4.98 km²
District
Tonkolili
Mineral
Gold

About Us

Who We Are

AK Minerals is a Sierra Leone-registered mining company holding a Mining Licence granted under the Mines and Minerals Development Act, 2023. We bring a disciplined, safety-first approach to gold extraction, drawing on hands-on experience running mechanised mining operations in West Africa.

We work in close partnership with the Kafe Chiefdom, from the Paramount Chief and Section Chief down to the villages nearest our licence area, because a mining project only succeeds when the community it operates alongside shares in its benefits. Our approach is to treat neighbours as partners: transparent about our plans, accountable to local authorities, and committed to leaving the land in good order once mining is complete.

The project is developed by AK Minerals (SL) Limited and is currently operated by its management and shareholder group. Verified management biographies will be published here following management approval.

Company Snapshot

Legal Name
AK Minerals
Licence Type
Mining Licence
Mineral
Gold
Regulator
National Minerals Agency (NMA)
Registered Address
7 Beach Road, Aberdeen, Freetown

Safety First

Mechanised operations run to disciplined safety and maintenance standards, protecting our workforce on site every day.

Regulatory Compliance

Operating within the framework of Sierra Leone’s 2023 Mines and Minerals Development Act, with regular reporting to the National Minerals Agency.

Community Partnership

Formal agreements with local chiefdom authorities and landholders, and a standing channel for community feedback and grievances.

Environmental Stewardship

Closed-loop water management and progressive land rehabilitation carried out throughout the life of the mine, not just at closure.

Project Kafe

The Project

Our licensed concession sits in the Kafe Chiefdom, Kabaia Section, Tonkolili District, within Sierra Leone’s Sula Mountains greenstone belt, an area with a long history of gold mineralisation.

Location
Royema-Thonkolie, Kafe Chiefdom, Tonkolili District
Concession Area
4.98 km² (498 hectares)
Terrain
Rolling, 100–300 m elevation
Hydrology
Seasonal wetlands & Tonkolili River tributaries
Access
Via the Makeni–Magburaka Highway; seasonal unpaved roads on site
Geology
Archaean greenstone belt: alluvial and hard-rock gold targets

How We Operate

Our operating model is mechanised surface mining, run on a seasonal schedule aligned to dry-season access and water availability. The process moves from extraction through to a secure, on-site gold room:

Step 01

Extraction

Shallow open-pit, selective mining of gold-bearing laterite and gravels.

Step 02

Haulage

Short haul from the pit to our on-site processing plant.

Step 03

Gravity Separation

Scrubbing, screening and centrifugal concentration: a chemical-free process.

Step 04

Recovery

Final recovery and smelting in a secure, on-site gold room.

The project employs a mix of local labour and experienced technical leads, with our workforce scaling with the phase of operations. We favour local hiring and skills development wherever possible.

Sierra Leone, On The Ground

General project-area imagery from Sierra Leone. These are illustrative photographs of the region and terrain, not a record of current operations or production.

Unpaved laterite access track climbing through dense green vegetation in the project region of Sierra Leone
Illustrative image

Terrain and vegetation, project region, Sierra Leone.

Forested hills with a small cluster of buildings at the valley floor in the project region of Sierra Leone
Illustrative image

Landscape and site access, project region, Sierra Leone.

Hand-held sample of quartz-veined rock from the project area
Illustrative image

Rock sample, project area. Shown for illustration only, not a resource or grade disclosure.

These images are illustrative of the project region and are not intended to represent current operations, production, or specific technical results.

The operating case

Built around a clear operating case.

30 t/hr

Processing capacity

10 hrs

Operating day

300 t

Daily feed

~3.0 g/t

Blended run-of-mine head grade

85%

Recovery

90,000 t

Annual feed

~229.5 kg

Recovered gold per year

23 carat

Gold quality

Base-case management assumptions. The 300 t/day plant feed is modelled as a blend of underground and open pit material from the project’s resource area, averaging to an approximate 3.0 g/t run-of-mine head grade. Precise scheduling and blend ratios are subject to detailed mine planning. Actual production will depend on grade distribution, recovery, plant availability, operating conditions and other technical factors.

Licence And Compliance

01

Mining licence

Current National Minerals Agency concession, treated by management as valid for a four-year period.

02

Regulatory framework

Granted under the Mines and Minerals Development Act, 2023. Regulator of record is the National Minerals Agency, Precious Minerals Trading Department.

03

Licence term

Specific commencement and expiry dates are not published on this site.

04

Documentation

Corporate and licence documentation is made available to counterparties and authorities on request, rather than published publicly.

Sustainability & Community

Operating Responsibly

Mining is a temporary use of the land and a long-term relationship with the people who live on it. Our commitments reflect both.

Community

Community Development Agreement

A formal agreement with the Kafe Chiefdom setting out a community development fund and profit-sharing arrangement, alongside annual surface rent payments to landholders and the chiefdom.

Community

Grievance Mechanism

A standing, formal channel for residents to raise concerns or disputes with the project, so issues are heard and addressed early.

Environment

Water Management

A closed-loop water system recycles process water between the plant and settling ponds, with a zero-discharge target during the dry season to protect local waterways.

Environment

Progressive Rehabilitation

Backfilling and topsoil replacement follow extraction as it proceeds, not only at mine closure, with revegetation and an EPA-approved closure plan for the site.

Livelihoods

Local Employment

Preference for local hiring across our workforce, with skilled roles open to community members alongside our technical leads.

Artisanal Mining

Coexistence & Formalisation

Where our concession overlaps with existing artisanal workings, our approach is coexistence: designated artisanal zones, fair-market purchase of artisanal production, and formal employment pathways for skilled artisanal miners.

“Success relies on converting the community from neighbours to partners.”

FAQ

Common questions.

What is AK Minerals?

AK Minerals (SL) Limited is developing a gold mining and processing project in Sierra Leone, currently operated by its management and shareholder group.

Where is the project?

The concession is located in the Kafe Chiefdom, Tonkolili District, Sierra Leone.

What does 3 g/t mean?

Approximately 3.0 g/t is the modelled blended run-of-mine head grade fed to the processing plant. It is a management planning assumption reflecting a blend of underground and open pit material from the project’s resource area, not a certified reserve grade.

Why are the licence and corporate documents not public?

AK Minerals restricts its concession and corporate documentation to verified counterparties, to prevent unauthorised use or misrepresentation of its documents.

Contact

Get in Touch

For enquiries about AK Minerals or Project Kafe, reach us directly.

Email info@ak-minerals.com

Registered Office

7 Beach Road
Aberdeen, Freetown
Sierra Leone

Project Site

Royema-Thonkolie
Kafe Chiefdom, Kabaia Section
Tonkolili District, Sierra Leone